联系我们

公司名称:XXX

电话:XXX

手机:XXX

联系人:XXX

地址:XXX

新闻动态
装修全包和半包有哪些
装修全包和半包有哪些?
What are the total and half packages?
1全包
1 full package
全包,类似于软件安装中的“完全安装”,是指从设计到施工全部由装潢公司负责,业主只参与设计方案与预算的审核确定与最后的工程验收。
Full package, similar to "full installation" in software installation, refers to the decoration company is responsible for all design and construction, the owner only participates in the design and budget verification and final project acceptance.
一般来说,装修全包包括毛坯房装修所用的材料费及人工费,材料有水管、龙头、洁具、电线、开关插座、灯具,木料、木板、地板、木门、窗帘架、吊顶、厨房料理台、吊柜、墙地砖、涂料油漆、五金、辅料等,当然有些材料可以由业主自购。
Generally speaking, the decoration package includes the materials and labor costs used in the decoration of the blank house. The materials include water pipes, taps, sanitary wares, wires, switch sockets, lamps and lanterns, wood, planks, floors, wooden doors, curtain racks, suspended ceiling, kitchen table, hangers, wall and floor tiles, paint, hardware, accessories and so on. Materials can be purchased by the owner himself.
2半包
2 half bag
半包则介于全包与清包之间,指业主负责选购主材,设计、辅料则由装潢公司或施工队购置提供。
Half of the package is between the full package and the clear package, referring to the owner is responsible for purchasing the main materials, design, accessories are purchased by the decoration company or construction team to provide.
一般来说,装修公司半包基础工程主要包含:
Generally speaking, the half package basic works of decoration company mainly include:
1、水电:所有电线、线管、人工及辅料
1, hydropower: all wires, pipes, manpower and accessories.
2、瓦工:所有水泥、沙子、砖头、人工及辅料
2. Bricklayer: all cement, sand, bricks, artificial and excipients.
3、木工:所有板材,人工及辅料
3. Carpenter: all plates, artificial and excipients.
4、油漆:所有油漆,人工
4. Paint: all paints, artificial
一、装修公司开工后,在电路方面业主需要自行购买的有:
First, after the decoration company starts, in the circuit, the owner needs to purchase it himself.
1、配套的开关底盒。前期业主要考虑用什么品牌的底盒与开关配套。底盒分为86型和118型,86型是插座强电与弱电分开的,118型是强电与弱电可以在一个底盒内共用的。
1, matching switch box. Early stage industry mainly considers what brand of bottom box and switch are necessary. The base box is divided into 86 type and 118 type, 86 type is the outlet strong and weak electricity separated, 118 type is strong and weak electricity can be shared in a base box.
2、强电箱。100平米的房子一般按10-12个回路来划分,常规需要10-14个回路强电箱,注意要将进户线与出户线分开。
2, strong box. A 100 square meter house is usually divided into 10-12 loops. Routinely, 10-14 loops of strong electric boxes are needed. Attention should be paid to separating the inbound and outbound lines.
3、弱电箱。开发商一般没有配置这个盒子,业主可以考虑用一个空盒子配置电视分配器、电话水晶分配头、路由器、电源、网络进户水晶头及出户水晶头等。也可以直接买成形的弱电箱,带路由功能形成家庭局域网,或者带HUB宽带集线器实现多台同时上网共享的功能。
3, weak electricity box. Developers generally do not configure this box, owners can consider using an empty box to configure TV dispatcher, telephone crystal dispatcher, router, power supply, network into the crystal head and out of the crystal head. You can also buy the weak box directly, with routing function to form a home LAN, or with HUB broadband hub to achieve multiple simultaneous Internet sharing functions.
4、16A、20A单极空开4-5个, 20A、32A双极空开2-4个,带漏电功能的40A双极空开1个,后期安装每个房间电器控制开关回路时会用到。
4, 16A, 20A unipolar open 4-5, 20A, 32A bipolar open 2-4, with leakage function of 40A bipolar open one, later installation of each room electrical control switch circuit will be used.
5、70个86型或者50-60个118型的开关插座配套。
5, 70 86 type or 50-60 118 type switch socket matching.
6、全房各种灯具。
6, all kinds of lamps and lanterns.
半包的好处:
The benefits of half Pack:
1、选择主要部分掌握主动权,正所谓“抓重点”。
1, choosing the main part to grasp the initiative is the so-called "focus".
2、主要建材自己购买,不论在安全上还是经济上都更放心。
2, the main building materials to buy their own, whether in security or economic is more assured.
3、由装潢公司帮自己设计,这样自己也不用再去钻研设计了,只要多多了解建材就可。
3. Design by the decoration company to help themselves, so that they do not have to study and design, as long as more understanding of building materials can be.
4、辅助建材由施工队配给,小事上也省了不少力。
4, the auxiliary building materials are allocated by the construction team, and little effort is saved.
半包的缺点:
Disadvantages of half Pack:
1、还是要话不少时间去跑建材市场,不能轻松装修。
1, still need to spend a lot of time to run the building materials market, can not easily decorate.
2、在签合同时一定要清楚注明哪些由装潢公司提供,哪些由业主自己购买,否则很容易在后期被装潢公司钻空子,弄得自己什么都要买,很疲惫也很被动。
2. When signing a contract, it is necessary to clearly state which decoration companies provide and which owners buy by themselves. Otherwise, it is easy for decoration companies to make a hole in the latter period and make themselves buy everything. It is very tired and passive.
3全包、半包哪种好?
3 which is better?
半包:相对比较省钱,也比较省心。
Half Pack: relatively cheaper, and less worry.
全包:虽然省力,但未必省心。对主材完全没有掌控权。除非公司允许您选主材,而不是强制某种主材。否则未必能让您满意。
Package: Although labor saving, but not necessarily worry. No control over the main material. Unless the company allows you to choose the main material, instead of forcing some kind of main material. Otherwise, you may not be satisfied.

联系方式

  1. 公司名称:XXX
  2. 电话:XXX
  3. 手机:XXX
  4. 联系人:XXX
  5. 地址:XXX

版权 © 廊坊市廊坊装修公司 网址:lfzhuangxiu.75ix.com  推荐:廊坊装修公司,廊坊装修设计哪家好

网站建设及优化保定遨游网络公司